It was time to prime the back of the retaining wall and cover it with Bituthene tanking material. At the same time and a late entry to requirements - the structural engineer decided a drainpipe was needed at the base of the trench. The length of the wall and base of the gap between the wall and earth, was covered in Bituthene and protection board.
Boss Jon negotiating a right angle |
Another day and Boss Jon is in the trench again, wearing out his fingers trying to get the last bit of Bituthene to stick |
Would that be Boss Jon in a trench?! |
Back of retaining wall - Bituthened |
Drain pipe in a cozy wrap to filter out any yuck |
Drain pipe with hundreds of perforations |
Oh yay, BarnGirl's first post |
Over and out for today.
Love
BarnGirl
xx
No comments:
Post a Comment