Saturday, 1 February 2014

Day 114 - Concrete, belt and braces

BarnGirl has a flat surface in the North Elevation at last.  I was able to step onto the concrete and take pics from each corner of the space.

NEast to SWest

SEast to NWest

SWest to NEast

NWest to SEast

While the concrete was 'curing' in the north elevation, the BarnBoys decided to play around on the monkey bars in the South! Boss Jon and Mat the Hat, fitted steel plates either side of the roof truss. This will replace the need for the lower angled truss, the boys' feet are resting on.


Boss Jon sorting out the bracket for the steel plate



Headless Matt on the climbing frame

Smiley Tim sorts the screws and bolts for the steel plates
Amazingly, we enjoyed a rare glimpse blue sky. Alas, not for long.  As soon as Captain Seth, Papa Bill and Mark have finished the rafters on the South Elevation, Boss Jon can give the nod to Seamus to start unravelling the Tyvek, giving the barn and BarnBoys a break from the relentless rain.

Love
BarnGirl
xx

No comments:

Post a Comment