Sunday, 20 April 2014

Day 184. April 1st - Upper Deck Floor Insulation Goes Down



Spaghetti Junction gets more spaghetti
Off hall to recording studio and Bedroom  2

The Dumb Waiter's room


Floor insulation in Ensuite, to/from wastepipe
Depth of insulation in Bedroom 2....cosy cosy



Inspector Walt says 'great insulation, but a bit slip slidy for me'



Master Bedroom floor insulation

Master Bedroom insulation and ply to ensuite and dressing room


On to the next....rumour has it Mr Wickens returns to fit the underfloor heating pipes in the Upper deck.
Methinks I won't be cold!
 
Love
BarnGirl
xx

No comments:

Post a Comment