Chris and Lubo fitting acoustic sound board in the ceiling of the recording studio |
Big Barry moves plaster wing man, Ben into place on the tower |
Wing man Ben, plasters the wall above BarnGirl's rather large fire escape (#NoTripodBlur) |
How do they do it? Beautiful job guys |
Plastered roof light in Utility room |
Wet plaster on outside wall of Bathroom 2 |
A few tools of the plastering trade |
By close of play on Saturday, Big Barry and the plaster boys, had almost finished the master bedroom. Meanwhile, Boss Jon and Chris-can-do-anything were plaster boarding the area around the door to the lower deck.
In the evening, BarnGirl arrived with huge bucket of paint, a telescopic roller, paint tray, paint brush and water, in readiness for Sunday and her first bit of painting since a trade show wall or photo shoot. The plaster in the dressing room is beautifully dry now and ready for its 'mist' coat. To you and me - 'tis standard paint watered down.
Big Barry will be back.
Love
BarnGirl
xx
No comments:
Post a Comment