Work on retaining wall continues. This is still only the back layer. Another wall of concrete blocks will be built in front of the upright steel, before concrete is poured between the two layers. A long, slow process.
|
Blockwork Ian - 'only a few more to go....then start again on the layers in front' |
|
|
|
Higher and higher |
|
The hooded man chain saws through solid concrete blocks |
|
The Barn Boys roll out damp proof material on top of brickwork - Front. North Elev | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
|
|
|
|
|
Damp proof material. East Elev | | | |
|
|
Yay oh yay. Timber arrives with a posse of joiners to replace some of the timber structure.
|
Timber for you, Sir |
Love
BarnGirl