Sunday, 20 April 2014

Day 188. April 5th - Laying the Underfloor Heating Pipes

Saturday morning and Mr Wickens was making great progress in the upper deck, laying reel upon reel of underfloor heating pipes. The heat will be generated by the Air Source Heat Pump outside. More of that another day....I'm still catching up on woefully delayed posts!

Looks like it's going to be a cosy hall

Hall - from inside out

U/floor heating pipes through hall to recording studio, bedroom and bathroom 2

Bathroom 2

But lo, who could this be asleep on the pipes? Goldilocks? I'd better go and check my porridge

Master Bedroom u/floor heating pipes

'They're looking hot hot hot'


Which one says 'ON'?

Underfloor Heating HQ
Great job, Mr Wickens. BarnGirl and Inspector Walt came up later to bring you a bag of cakes for your Saturday kindness. Sorry we missed you.

On to the next......
Love 

BarnGirl
xx


Day 184. April 1st - Upper Deck Floor Insulation Goes Down



Spaghetti Junction gets more spaghetti
Off hall to recording studio and Bedroom  2

The Dumb Waiter's room


Floor insulation in Ensuite, to/from wastepipe
Depth of insulation in Bedroom 2....cosy cosy



Inspector Walt says 'great insulation, but a bit slip slidy for me'



Master Bedroom floor insulation

Master Bedroom insulation and ply to ensuite and dressing room


On to the next....rumour has it Mr Wickens returns to fit the underfloor heating pipes in the Upper deck.
Methinks I won't be cold!
 
Love
BarnGirl
xx

Saturday, 19 April 2014

Day 173 - 181. March 21st - 29th - Seth Returns to Add Beautiful Oak Cladding


BarnGirl and a new look Inspector Walt wandered up to the barn looking forward to inspecting today's activity - the fitting of some of the oak window frames and the return of Captain Seth, to make a start on the oak feathered-weather boarding.

Inspector Walt sashayed on site, in his light weight Summer capsule collection, hoping for a thumbs up from the BarnBoys and Pup Brody.

BarnGirl was required to confirm 'window furniture', a trumped up term for the metal thingy which opens and closes the windows.  I believe the proper name is cockspur and risers, but that just sounds rude! 


North Elevation

West Elev




As if by magic, the scaffolding is removed.......




So pleased with the oak cladding going up on the West elev. Looks great with the oak window frames. BarnGirl won't be painting the barn with any dodgy black paint. It'll be left to mature naturally to a silvery grey. 


What a fine job, BarnBoys.
On to the next
Love
BarnGirl
xx

Day 160. March 8th - Warm as Toast!


Master Bedroom wrapped snugly in thick layers of Celotex






Bathroom 2

Doors to Bathroom 2, Recording Studio and Bedroom 2

South Elevation Insulation Storage Room




Roof of hall and porch

Utility Room

Structure for roof light


Neatly wired and ready to go

Rentokil arrives to treat all the timber

Roof ready and waiting for Huuuw's hand made slate ridge tiles



On to the next.....
Love
BarnGirl
xx

Day 151. February 27th - With the roof almost finished 'tis time for the BarnBoys to go back indoors to insulate












Tim masks his smile during this VERY dusty work




Got any Milk Tray?


On to the next.....
Love 
BarnGirl