Wednesday 19 February 2014

Day 121 and 122 - More Rain, More Ply and finally Waterproof Felt

Need I say more?

Conditions too muddy for Inspector Walt. Rumour has it, bespoke Inspector wellies are in the post
Master Bed n Bath, before ply, felt and batons

BarnBoys complete stud work on West Elev and add ply


From East looking West

Still chucking it down. Yet still the boys continue. Well done all!

Neil and Danny adding felt to the Southside


I love you, Mr Tyvek


Almost covered

My building regs fire escape


Ok, BarnGirl needs to start her Blue Peter mock-up fireplace

Love
BarnGirl
xx





Day 116 - Applying the Ply

I'm so far behind on posts again, so it's picture time again, until I can find a way out of the 'cupboard' to write.






BarnBoys cutting and applying ply


Meanwhile, over on the South side, Captain Seth and his team worked on the roof timbers.


Captain Seth praying for a dry day




Love
BarnGirl
xx

Saturday 1 February 2014

Day 114 - Concrete, belt and braces

BarnGirl has a flat surface in the North Elevation at last.  I was able to step onto the concrete and take pics from each corner of the space.

NEast to SWest

SEast to NWest

SWest to NEast

NWest to SEast

While the concrete was 'curing' in the north elevation, the BarnBoys decided to play around on the monkey bars in the South! Boss Jon and Mat the Hat, fitted steel plates either side of the roof truss. This will replace the need for the lower angled truss, the boys' feet are resting on.


Boss Jon sorting out the bracket for the steel plate



Headless Matt on the climbing frame

Smiley Tim sorts the screws and bolts for the steel plates
Amazingly, we enjoyed a rare glimpse blue sky. Alas, not for long.  As soon as Captain Seth, Papa Bill and Mark have finished the rafters on the South Elevation, Boss Jon can give the nod to Seamus to start unravelling the Tyvek, giving the barn and BarnBoys a break from the relentless rain.

Love
BarnGirl
xx