Day 52 - More Concrete in the South

Mr EasyCrete arrives to pump concrete over and in between the steel mesh.  The Scooby Doo sandwich (the floor in the south elevation) now consists of a layer of crushed concrete, concrete a couple of mil thick, Preprufe tanking (the white material), two layers of steel mesh with plastic chairs dividing them and now another layer of concrete. Sjhushed and levelled by the BarnBoys.


West to East of South Elev


East to West of South Elev


Back of Kitchen Wall
Preprufe membrane 'tanking', to prevent moisture ever thinking of getting in the building!

Scooby Doo Sandwich Close up




Living Space from above. Retaining wall will run along line of upright steel

Dining Room from above


Hollywood Paws
Inspector Walt decides that the concrete hasn't 'cured' yet!


























For fear of getting behind, will crack on with the next.